12.3.2    Passive vs. Active Information Delivery

prev

next
Missing Setup: Passive vs Active Delivery!
As we will detail later in Part V, studies showed that passive "critics" were often not activated early enough in the "design" process to prevent designers from pursuing solutions known to be suboptimal. Often, subjects invoked the passive critiquing system only after they thought they had completed the design. By this time, the effort of repairing the situation was prohibitively expensive. In a subsequent study using the same design environment, an active critiquing strategy was shown to be more effective by detecting problematic situations early in the design process.
Active delivery mechanisms, such as critics, are especially effective if the delivered information is related to identifying unsatisfactory conditions in the current design. Intervention immediately after a suboptimal or unsatisfactory action has occurred (immediate "intervention strategy") has the advantage that the problem "context" is still active in the designers' mind and the designers still know how they arrived at the solution.
When building active delivery mechanisms, there is a problem of how to segment sequential tasks. When designers' tasks are not discrete, but are continuous and in real time, it is difficult for the system to determine the point at which the designers are done from an anomalous condition [??Silverman, 1992 #48??]. For example, in designing a kitchen, computing the total cost of design elements at the beginning of the design is absurd. The granularity of segmentation determines the time frequency of delivery. A finer grain of analyses may make the delivery more disruptive. A larger grain, on the other hand, would delay feedback past the cost-recoverable point, as discussed above [Carroll & McKendree, 1987].
 

prev

next